Investment

The mirrored façade reflects the environment and disappears into the landscape. It creates curiosity, attention and higher perceived value.

Investment

Indicative investment overview

The figures below represent a simplified example to illustrate potential performance. Actual outcomes depend on location, operator setup and market conditions.

Indicative figures

Unit cost
80,000 – 120,000 SEK
Transport & installation
Structured per project scope
Site preparation
Depends on site terrain
Typical payback
~1–2 years (indicative)

Illustrative operating assumptions

This simplified scenario is intended to show the commercial logic behind the indicative payback range. Final performance depends on location, operator model, pricing strategy and achieved occupancy.
Indicative ADR
SEK 3,500–4,500 / night
Indicative occupancy
45–60% annually
Indicative OPEX
Operator-dependent
Sensitivity
Payback improves with higher ADR and stronger occupancy
Reading the scenario
This is not a guarantee of financial outcome. It is a directional example showing how pricing power, occupancy and site conditions affect return profile.
Technical overview

Technical overview

A refined, standardized unit — built for repeatability without compromising experience.

From footprint to façade, every element is engineered to simplify deployment while maintaining architectural quality in real-world environments.

SCALABLE CONCEPT

The concept scales without losing exclusivity.

Mirrored Houses can be installed as:

  • A single premium signature unit
  • A curated micro-cluster (2–5 units)
  • A larger nature-integrated destination concept

Technical overview

A standardised unit with a clear delivery logic.

Mirrored is designed as a repeatable hospitality unit with defined site requirements, utility connections and delivery conditions. The purpose is to make specification, planning and deployment easier to understand from the outset.

Technical data

Indicative technical overview

Internal area
34 m² fully equipped unit
Site access
Truck and crane access required
Foundation
10 reinforced footings or rammed metal piles
Electricity
Plug & play 3x16A, 220V
Water & sewer
Water Ø32 mm / Sewer Ø110 mm
Crane capacity
Minimum 10 tons
Final specification, site preparation and authority requirements should be confirmed against location, access conditions and local regulations.

What you get

A clearer view of what is included in the Mirrored scope.

Design-led hospitality unit
A premium mirrored unit designed for short-stay hospitality use, with strong visual identity and a fully equipped interior basis.
Production & base build
Manufactured off-site as a repeatable product platform, intended to reduce on-site complexity and improve delivery consistency.
Delivery logic
Transported as a completed unit, subject to site access, lifting conditions and final project-specific logistics.
Installation requirements
Requires prepared foundations, utility connections and crane handling at site. These items should be coordinated as part of the project setup.
Project support & next-step material
Suitable to pair with specification packs, drawings, delivery planning, permit input and a fuller deployment discussion per project.
Scope can vary depending on configuration, country, site conditions and operator model. A final specification and delivery scope should always be confirmed per project.

Next step

Let’s evaluate your site

Share a few details about your location and ambitions — we’ll return with a clear next step, project framing and potential setup.

What we’ll help you assess

Site fit, project scale, commercial framing, likely setup and the most relevant next step for your location.

Response time

We typically respond within 24–48 hours with a clear next step and suggested direction.